000 01946nam a22003017a 4500
999 _c47804
_d47801
003 OSt
005 20210501054551.0
008 210501b ||||| |||| 00| 0 eng d
040 _cACKU
041 _a124
043 _aa-af---
050 0 0 _aPamphlet GE300 E589 2011
245 0 0 _aEnvironmental Assessment and Report: Islamic Republic of Afghanistan, Transport Network Development Investment Program (Fayzabad–Beharak Road).
260 _a[Kabul, Afghanistan]: [Asian Development Bank(ADB)], 2011.
300 _a[5], 110 pages: illustration, map, chart; 30 cm.
500 _a“Transport network development investment program (RRP AFG 44482-02)” – head of cover page.
500 _a“Initial Environmental Examination Project Number: 44482-02” – cover page.
500 _a“This document has been prepared by the ministry of public works of the Islamic Republic of Afghanistan for the Asian development bank (ADB)” – cover page.
500 _aContent: Executive summary – Chapter–1: Introduction – Chapter 2: Description of the project – Chapter 3: Description of the environment – Chapter 4: Anticipated environmental impacts and mitigation measures – Chapter 5: Alternatives – Chapter 6: Institutional requirements and environmental management plan – Chapter 7: Public consultation and information disclosure – Chapter 8: Grievance redress mechanism – Chapter 9: Findings and recommendations – Chapter 10: Conclusions – References.
500 _aOnly the PDF copy is available in the library of ACKU.
546 _a124
650 0 _aEnvironmental assessment.
650 0 _aEnvironmental management.
650 0 _aEnvironmental management – Afghanistan.
650 0 _aEnvironmental management –International cooperation.
856 _qPDF
_uhttps://doi.org/10.29171/acku_pamphlet_ge300_e589_2011
_zScanned for ACKU
942 _2lcc
_cENVIRONMEN
_kacku_pamphlet_ge300_e589_2011