000 02216nam a22003257a 4500
999 _c47114
_d47111
003 OSt
005 20200907091807.0
008 200907b ||||| |||| 00| 0 eng d
040 _cACKU
041 _a124
043 _aa-af---
050 0 0 _aPamphlet HD1698.
_bA3.
_cO458 2006
100 1 _aOeltzschner, Hansjorg.
245 1 0 _aExtension of consultancy services for sanitation improvement in Kabul city :
_bsolid waste management : report of the environmental expert : environmental impact assessment for contract KM 517 construction of new landfill site # 2 in district 17 including composting facilities /
_cauthor Hansjӧrg Oeltzschner.
250 _aRevised edition October 2007.
260 _a[Germany] :
_b[ICON Institute ; Public Sector],
_c2006.
300 _a[31] unnumbered pages :
_bcolor illustrations, color maps ;
_c30 cm.
500 _aCover title. “November 2006”. “E1764 ; v1”. “Public Disclosure Authorized”—cover page.
505 _aContents: Executive summary—I report—1. Introduction—2. Environmental assessment (EIA)—3. References—4. Acknowledgements—Annexes.
520 _aSummary: “The Short Term Expert (STE) has carried out a fourth mission in Kabul as Environmental/Geo-technical Expert and member of the team of Gauff Engineers, Frankfurt. He stayed in Kabul from October 30th until November10th, 2006. In accordance with the partners of the consultant team the STE has carried out (besides other tasks) the assessment of environmental impacts caused by the planned new sanitary landfill site # 2 at the Koh-e-Badasia mountain range. The results of the STE’s investigations and evaluations are: …”—summary page.
546 _a124
650 0 _aWater management – Afghanistan.
650 0 _aWater resources development – Afghanistan.
650 0 _aAgriculture – Economic aspects – Afghanistan.
650 0 _aEnvironmental management – Afghanistan.
650 0 _aEconomic development – Afghanistan.
650 0 _aAgriculture – Afghanistan.
856 _qPDF
_uhttps://doi.org/10.29171/azu_acku_pamphlet_hd1698_a3_o458_2006
_zScanned for ACKU.
942 _2lcc
_cENVIRONMEN
_kazu_acku_pamphlet_hd1698_a3_o458_2006