Investment plan for the Panj-Amu Basin : Afghanistan Water Resources Development (AWARD) project-Technical and Implementation Support Consultancy (TISC) / report submitted by Landell Mills LTD.

Material type: TextTextLanguage: English Publication details: [Place of publication not identified] : [World Bank], 2013.Description: iv, 97 pages : color maps ; 30 cmSubject(s): LOC classification:
  • Pamphlet GB1359. A3.
Online resources:
Contents:
Contents: 1. Executive summary—2. Introduction—3. Water resources and demand for year 2030—4. Approach and methodology—5. Scenario analysis results—6. Conclusions and recommendations—Appendixes.
Summary: Summary: “The Afghanistan Water Resources Development (AWARD) technical assistance project was prepared through a World Bank Water Resources Development proposal which was approved by the Afghanistan Reconstruction Trust Fund (ARTF) in December 2008. The grant became effective upon the signing of the ARTF grant No. TF0903637 on 23 March 2009, and follows conditions for grants made by the World Bank out of various funds. The Technical Implementation Support Consultancy (TISC) was contracted by the Ministry of Energy and Water (MEW) in January 2011 and the team was mobilized in late…”—(page 1).
Holdings
Item type Current library Call number Status Date due Barcode Item holds
Monograph Monograph Afghanistan Centre at Kabul University Pamphlet GB1359.A3.I694 2013 (Browse shelf(Opens below)) Available 3ACKU000539907
Total holds: 0

Cover title.
“June 2013”.
“Grant No. TF093637-AF/contract No. MEW/957/QBS”—cover page.

Includes bibliographical references.

Contents: 1. Executive summary—2. Introduction—3. Water resources and demand for year 2030—4. Approach and methodology—5. Scenario analysis results—6. Conclusions and recommendations—Appendixes.

Summary: “The Afghanistan Water Resources Development (AWARD) technical assistance project was prepared through a World Bank Water Resources Development proposal which was approved by the Afghanistan Reconstruction Trust Fund (ARTF) in December 2008. The grant became effective upon the signing of the ARTF grant No. TF0903637 on 23 March 2009, and follows conditions for grants made by the World Bank out of various funds. The Technical Implementation Support Consultancy (TISC) was contracted by the Ministry of Energy and Water (MEW) in January 2011 and the team was mobilized in late…”—(page 1).

English