Analysis of experiences and lessons learned in program implementation from 09/2003 to 03/2006 / Deutsche Gesellschaft fuer Technische Zusammenarbeit (GTZ).
Material type: TextLanguage: English Publication details: Kabul, Afghanistan : Deutsche Gesellschaft fuer Technische Zusammenarbeit (GTZ), 2006.Description: iv, 42, 9 pages ; 30 cmSubject(s): LOC classification:- Pamphlet HN670.6. Z9.
Item type | Current library | Call number | Status | Notes | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Monograph | Afghanistan Centre at Kabul University | Pamphlet HN670.6.Z9.A635 2006 (Browse shelf(Opens below)) | Available | Donated by Afghanaid. | 3ACKU000387067 |
Browsing Afghanistan Centre at Kabul University shelves Close shelf browser (Hides shelf browser)
Pamphlet HN670.6.Z9.A437 2017 The effectiveness of foreign aid in rural development of Afghanistan : | Pamphlet HN670.6.Z9.A538 1995 ICRC in Afghanistan : | Pamphlet HN670.6.Z9.A584 2008 Alternative Development Program-Eastern region : | Pamphlet HN670.6.Z9.A635 2006 Analysis of experiences and lessons learned in program implementation from 09/2003 to 03/2006 / | Pamphlet HN670.6.Z9.A66 2010 UNDP Afghanistan : | Pamphlet HN670.6.Z9.A668 1999 Annual workplan, 1998/99 : | Pamphlet HN670.6.Z9.A668 2008 RBLS annual work plan from April-2007 up to March-02008 : |
Cover title.
Spiral bound.
“March 2006”.
“Oversight Consultant of the National Solidarity Program in Afghanistan”—at head of title.
Includes bibliographical references.
Contents: abbreviations—Introduction—Part 1 : performance—Part 2 : const analysis—Part 3 : optimizing the implementation of NSP-past and future measures.
Summary: “The present report ton the National Solidarity Program (NSP) consists of three parts: 1) an analysis of program performance ; 2) an analysis of implementation costs ; and 3) a description of measures taken and additional recommendations to improve program performance…”—(page i).
English