Kabul river valley development project [photocopy] / Democratic Republic of Afghanistan, Ministry of Water and Power ; Montreal Engineering Company.
Material type: TextLanguage: Publication details: Montreal, Canada : Montreal Engineering Company, [1980].Description: xxx, [116] p. : maps ; 30 cmSubject(s):- Water resources development – Afghanistan – Kabul River
- Kabul River Valley Development
- Irrigation – Afghanistan – Kabul River Valley
- Kabul River Valley (Afghanistan) – Planning
- Logar River Valley (Afghanistan) – Planning
- Panjshir River Valley (Afghanistan) – Planning
- Drainage – Afghanistan – Kabul River Valley – Evaluation
- Pamphlet HD 1699 .A34 .K33 /1980/ + /PDF/(27.2MB)
Item type | Current library | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|
Books | Afghanistan Centre at Kabul University | Pamphlet HD 1699 .A34 .K33 /1980/ + /PDF/(27.2MB) (Browse shelf(Opens below)) | Available | 21368 |
Browsing Afghanistan Centre at Kabul University shelves Close shelf browser (Hides shelf browser)
B 7.371 CAS -833 Children in war : drawings from the Afghan refugee camps / [collected by Alfred and Francoise Brunner]. | Pamphlet HC 418 .B36 .L46 /1991 Focus on central Afghanistan : a special report prepared for the office of the AID representative for Afghanistan affairs in Pakistan / Timothy Lenderking. | Pamphlet HQ 1735.6 .Z59 1995 Women in Afghanistan history / by M. Saeed Zhwak | Pamphlet HD 1699 .A34 .K33 /1980/ + /PDF/(27.2MB) Kabul river valley development project [photocopy] / Democratic Republic of Afghanistan, Ministry of Water and Power ; Montreal Engineering Company. | R 13.175 BIP -9951 Handbook for appling the guiding principles on internal displacement / The Brookings Institution Project on Internal Displacement | Pamphlet JV 8752.3 .U54 2007 UNHCR Afghanistan Assisted Repatriation Operation : assisted return by encashment center in Afghanistan. | B 14.762 AMN -6086 Amnesty International report 1988 |
“Master plan report, Book one of two”—title page.
Contents: Book one of two. Letter of transmittal—Preface—Summary of principal findings and conclusions—Summary of recommendations—Table of contents—Part 1-Physical description of the Kabul river basin—Part 2-the Present state of development—Part 3-planning criteria—Part 4-municipal water supply—Part 5-Irrigation—Part 6-Power demand and supply—Part 7-multipurpose basin development.
Book two of two. Appendix A-hydrology and water resource system simulation—Appendix B-project inventory—Appendix C-cost estimates—Appendix D-sociological profiles—Appendix E-agriculture—Appendix F-power supply from Kajakai—Appendix G-review of groundwater resources and development possibilities—Appendix H-Mahipar off-channel storage—Appendix I-terms of reference and comments from the governments of Afghanistan and Canada on the draft master plan report—Appendix J-bibliography.