Initial Environmental Examination: AFG: Transport Network Development Investment Program (Beharak–Eshkashim Section). (Record no. 47886)

MARC details
000 -LEADER
fixed length control field 01996nam a22003017a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210504045651.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210504b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency ACKU
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-af---
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number GE300 I53 2014
245 00 - TITLE STATEMENT
Title Initial Environmental Examination: AFG: Transport Network Development Investment Program (Beharak–Eshkashim Section).
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc [Afghanistan]: [Publisher not identified)], 2014.
300 ## - PHYSICAL DESCRIPTION
Extent 121 pages: illustration, color map, chart; 30 cm.
500 ## - GENERAL NOTE
General note “44482-025” – cover page.
General note “This document has been prepared by the ministry of public works of the Islamic republic of Afghanistan for the Asian development bank (ADB)” – cover page.
General note “This Initial Environmental Examination is a document of the borrower. The views expressed <br/>herein do not necessarily represent those of ADB’s board of directors, management, or staff, <br/>and may be preliminary in nature” – cover page.<br/>
General note Contents: Abbreviations – Glossary of environmental terms – Executive summary – Chapter-1 Introduction – Chapter-2 Legal and administrative framework – Chapter-3 Description of the project – Chapter-4 Description of baseline information – Chapter- 5 Environment impact and mitigation measures – Chapter-6: Institutional requirement of environment monitoring program – Chapter-7 Public consultation and information disclosure – Chapter-8 Environmental management plan – Chapter-9: Findings and recommendations.
General note Only the PDF copy is available in the library of ACKU.
546 ## - LANGUAGE NOTE
Language note English
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Environmental assessment.
Topical term or geographic name as entry element Environmental management.
Topical term or geographic name as entry element Environmental management – Afghanistan.
Topical term or geographic name as entry element Environmental management –International cooperation.
856 ## - ELECTRONIC LOCATION AND ACCESS
Electronic format type PDF
Uniform Resource Identifier <a href="https://doi.org/10.29171/acku_ge300_i53_2014">https://doi.org/10.29171/acku_ge300_i53_2014</a>
Public note Scanned for ACKU
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Environment
Call number prefix acku_ge300_i53_2014
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Library of Congress Classification     Afghanistan Centre at Kabul University Afghanistan Centre at Kabul University 04/05/2021   GE300 I53 2014 3ACKU000480219 04/05/2021 04/05/2021 Environment