Borrower’s Project Implementation Plan (BPIP) for emergency transport rehabilitation project / (Record no. 47092)

MARC details
000 -LEADER
fixed length control field 02119nam a22003017a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200905092132.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141012b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency ACKU
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-af---
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number Pamphlet HV555.
Item number A3.
Class number B677 2003
245 00 - TITLE STATEMENT
Title Borrower’s Project Implementation Plan (BPIP) for emergency transport rehabilitation project /
Statement of responsibility, etc Ministry of Public Works & Ministry of Civil Aviation Tourism / Transitional Islamic State of Afghanistan.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc [Afghanistan] :
Name of publisher, distributor, etc International Development Association (IDA),
Date of publication, distribution, etc 2003.
300 ## - PHYSICAL DESCRIPTION
Extent 56 pages, [5] unnumbered pages :
Other physical details illustration ;
Dimensions 30 cm.
500 ## - GENERAL NOTE
General note Cover title.<br/>“February 2003”.<br/>“E621 ; Volume 5”—at head of title.<br/>“Public Disclosure Authorized”—cover page.<br/>
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents: I. The project—II. Institutional arrangements—III. Project administration—IV. Implementation and disbursement schedules—V. Monitoring and evaluation—Annexes.
520 ## - SUMMARY, ETC.
Summary, etc Summary: “The development objective of the proposed Emergency Transport Rehabilitation Project is to facilitate the country's economic and social recovery through improved physical access to goods, markets, and administrative and social services. The development objective will be achieved by: (i) removing key transport bottlenecks that seriously hamper recovery, (ii) building capacity in management, implementation, and maintenance of transport services and works through the provision of equipment and technical assistance related to planning, maintenance, and supervision of works, and (iii)…”—(page 1).
546 ## - LANGUAGE NOTE
Language note English
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Humanitarian assistance
Geographic subdivision Afghanistan.
Topical term or geographic name as entry element Economic development – Afghanistan.
Topical term or geographic name as entry element Economic assistance
Geographic subdivision Afghanistan.
Topical term or geographic name as entry element Food security – Afghanistan.
Topical term or geographic name as entry element Disaster relief – Afghanistan.
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Afghanistan – Economic conditions.
856 ## - ELECTRONIC LOCATION AND ACCESS
Electronic format type PDF
Uniform Resource Identifier <a href="https://doi.org/10.29171/azu_acku_pamphlet_hv555_a3_b677_2003">https://doi.org/10.29171/azu_acku_pamphlet_hv555_a3_b677_2003</a>
Public note Scanned for ACKU.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Monograph
Call number prefix azu_acku_pamphlet_hv555_a3_b677_2003
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Library of Congress Classification     Afghanistan Centre at Kabul University Afghanistan Centre at Kabul University 05/09/2020   Pamphlet HV555.A3.B677 2003 3ACKU000546274 05/09/2020 05/09/2020 Monograph