Environmental and Social Impact Assessment (ESIA) for proposed Karokh 31KM, 110KV transmission line (a component of Herat electrification project) / (Record no. 46946)

MARC details
000 -LEADER
fixed length control field 02125nam a22003017a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200713093341.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 200713b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency ACKU
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-af---
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number GE320.
Item number A33.
Class number E695 2019
245 00 - TITLE STATEMENT
Title Environmental and Social Impact Assessment (ESIA) for proposed Karokh 31KM, 110KV transmission line (a component of Herat electrification project) /
Statement of responsibility, etc implementing agency Da Afghanistan Breshna Sherkat (DABS).
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Kabul, Afghanistan :
Name of publisher, distributor, etc Da Afghanistan Breshna Sherkat (DABS),
Date of publication, distribution, etc 2019.
300 ## - PHYSICAL DESCRIPTION
Extent xx, 188 pages :
Other physical details color illustrations, color maps ;
Dimensions 30 cm.
500 ## - GENERAL NOTE
General note Cover title.<br/>“January 2019”.<br/>“Islamic Republic of Afghanistan”—at head of title.<br/>“دافغانستان برښنا شرکت”—cover page.<br/>
504 ## - BIBLIOGRAPHY, ETC. NOTE
Linkage Includes bibliographical references.<br/>
520 ## - SUMMARY, ETC.
Summary, etc Summary: “The Government of Afghanistan (GoA), through Da Afghan Breshna Sherkat (DABS) plans to implement the Herat Electrification Project (HEP) in Herat province. The project is financed by the World Bank (WB) and includes, among other sub-projects, installation of a 31 kilometers (km) long transmission line from Robate Sorkh village to the proposed location of Karokh sub-station in Karokh district. To address the potentially negative environmental and/or social impacts of the Karokh transmission line (KTL) sub-project, and to comply with the national regulatory as well as the WB policy requirements, an environmental and social assessment (ESIA) has been carried out…”—(page iv).
546 ## - LANGUAGE NOTE
Language note English
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Environmental management – Afghanistan.
Topical term or geographic name as entry element Water resources development – Afghanistan.
Topical term or geographic name as entry element Environmental protection – Afghanistan.
Topical term or geographic name as entry element Humanitarian assistance – Afghanistan.
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Afghanistan – Environmental conditions.
Geographic name Afghanistan – Politics and government – 2001-.
856 ## - ELECTRONIC LOCATION AND ACCESS
Electronic format type PFD
Uniform Resource Identifier <a href="https://doi.org/10.29171/azu_acku_ge320_a33_e695_2019">https://doi.org/10.29171/azu_acku_ge320_a33_e695_2019</a>
Public note Scanned for ACKU.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Environment
Call number prefix azu_acku_ge320_a33_e695_2019
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Library of Congress Classification     Afghanistan Centre at Kabul University Afghanistan Centre at Kabul University 13/07/2020   GE320.A33.E695 2019 3ACKU000544600 13/07/2020 13/07/2020 Environment