MARC details
000 -LEADER |
fixed length control field |
02662nam a22003017a 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20190527121640.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
190527b ||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Transcribing agency |
ACKU |
041 ## - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
043 ## - GEOGRAPHIC AREA CODE |
Geographic area code |
a-af--- |
050 00 - LIBRARY OF CONGRESS CALL NUMBER |
Classification number |
Pamphlet HD9502. |
Item number |
A47. |
Class number |
P694 2013 |
245 00 - TITLE STATEMENT |
Title |
Power sector master plan : |
Remainder of title |
final report / |
Statement of responsibility, etc |
Asian Development Bank (ADB). |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) |
Place of publication, distribution, etc |
Germany : |
Name of publisher, distributor, etc |
FICHTNER ; |
-- |
Asian Development Bank (ADB), |
Date of publication, distribution, etc |
2013. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
x, 451 pages : |
Other physical details |
color maps ; |
Dimensions |
30 cm. |
500 ## - GENERAL NOTE |
General note |
“May 2013”.<br/>“Technical Assistance Consultant’s Report”—cover page.<br/>“Project Number : 43497”—cover page.<br/>“Islamic Republic of Afghanistan : power sector master plan (financed by the Japan fund for poverty reduction)—cover page.<br/>“Prepared by FICHTNER GmbH & Co. KG”—cover page.<br/>“Sarweystrasse 3, 70191 Stuttgart ; Germany”—cover page.<br/>“This consultant’s report does not necessarily reflect the views of ADB or the government concerned, and ADB and the government cannot be held liable for its contents. (for project preparatory technical assistance : all the views expressed herein may not be incorporated into the proposed project’s design”—cover page.<br/>“Islamic Republic of Afghanistan, Ministry of Energy and Water”—at head of title.<br/> |
504 ## - BIBLIOGRAPHY, ETC. NOTE |
Linkage |
Includes bibliographical references.<br/> |
505 ## - FORMATTED CONTENTS NOTE |
Formatted contents note |
Contents: 1. Executive summary—2. Introduction / project description—3. Demand orecast—4. Assessment of power purchase agreements—5. Present status of power system—6. Projects as candidates for generation and transmission expansions—7. Synchronous operation mode for Afghan power system. |
520 ## - SUMMARY, ETC. |
Summary, etc |
Summary: “The scope of the Power Sector Master Plan for Afghanistan was to identify the priorities, time frame and costs associated with power sector development goals. The present report includes the results of work performed for development of Power Sector Master Plan and includes also the comments received from the Ministry, DABS and the Donors. Furthermore the report is aimed to be and it forms the basis for discussion during presentation to the Ministry of Energy and Water in April 2013…”—(pages summary). |
546 ## - LANGUAGE NOTE |
Language note |
English |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name as entry element |
Energy policy – Afghanistan. |
|
Topical term or geographic name as entry element |
Power resources – Afghanistan. |
|
Topical term or geographic name as entry element |
Energy sector – Afghanistan. |
|
Topical term or geographic name as entry element |
Postwar reconstruction – Afghanistan. |
|
Topical term or geographic name as entry element |
Electric power production – Afghanistan. |
856 ## - ELECTRONIC LOCATION AND ACCESS |
Electronic format type |
PDF |
Uniform Resource Identifier |
<a href="https://doi.org/10.29171/azu_acku_pamphlet_hd9502_a47_p694_2013">https://doi.org/10.29171/azu_acku_pamphlet_hd9502_a47_p694_2013</a> |
Public note |
Scanned for ACKU. |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Library of Congress Classification |
Koha item type |
Monograph |
Call number prefix |
azu_acku_pamphlet_hd9502_a47_p694_2013 |