The game of numbers : (Record no. 44088)

MARC details
000 -LEADER
fixed length control field 02172nam a22003257a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20180811134805.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180811b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency ACKU
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
043 ## - GEOGRAPHIC AREA CODE
Geographic area code a-af---
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number Pamphlet HC417.
Item number A393 2017
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Afzali, Sayed Ikram.
245 14 - TITLE STATEMENT
Title The game of numbers :
Remainder of title analysis of the national budget 2018 /
Statement of responsibility, etc authors Sayed Ikram Afzali, Mohammad Naser Timory.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Kabul, Afghanistan :
Name of publisher, distributor, etc Integrity Watch Afghanistan (IWA),
Date of publication, distribution, etc ©2017.
300 ## - PHYSICAL DESCRIPTION
Extent v, 38 pages :
Other physical details color illustration ;
Dimensions 27 cm.
500 ## - GENERAL NOTE
General note Cover title.<br/>“December 2017”.<br/>
504 ## - BIBLIOGRAPHY, ETC. NOTE
Linkage “Includes bibliography”—(pages 37-38).<br/>
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents: About Integrity Watch Afghanistan—List of acronyms—Acknowledgments—1. Executive summary—2. Methodology—3. Introduction—4. Comparative analysis of the national budgets—5. Weaknesses in managing budgets—6. The distortive role of the national assembly in the budget process—7. Development projects vulnerable to political influence (DPVPI)—8. Conclusion—Bibliography—Boxes.
520 ## - SUMMARY, ETC.
Summary, etc Summary: “The Afghan government has for many years been able to spend only around half its development budget-a serious concern given the pressing need for investment in Afghan infrastructure. Rather than tackle the root causes of this problem-including lack of public participation, centralization of budgeting and procuring powers, undue political influence, low capacity of the civil servants, and lack of leadership-the government has sharply reduced development spending in its most recent budget. The government has made progress in some areas, with increased revenue collection a notable bright spot…”—(page 2).
546 ## - LANGUAGE NOTE
Language note English
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Economic assistance – Afghanistan.
Topical term or geographic name as entry element Economic development – Afghanistan.
Topical term or geographic name as entry element Community development – Afghanistan.
Topical term or geographic name as entry element Humanitarian assistance – Afghanistan.
651 #0 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name Afghanistan – Foreign relations
Geographic name Afghanistan – Economic policy.
Geographic name Afghanistan – Economic conditions.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Monograph
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Library of Congress Classification     Afghanistan Centre at Kabul University Afghanistan Centre at Kabul University 11/08/2018   Pamphlet HC417.A393 2017 3ACKU000532886 11/08/2018 2 11/08/2018 Monograph
    Library of Congress Classification     Afghanistan Centre at Kabul University Afghanistan Centre at Kabul University 11/08/2018     3ACKU000532894 11/08/2018   11/08/2018 Monograph