Chakhansur Flood control and irrigation project Afghanistan : Feasibility study.

[San Francisco, California] : Asian Development Bank, International Engineering Company, 1973.
vii, [148] p. : maps ; 30 cm.
Flood control – Afghanistan.
Agriculture – Afghanistan.
Afghanistan – Climate.
Chakhansur (Afghanistan) – Climate.
Pamphlet HD 1676 .A34 .C53 /1973/ + /PDF/(9.24MB)
21367
Cover title.
“July 1973”.
“Asian Development Bank, Philippines”—at head of title.
“Volume I – report”—cover page.
“Draft : IECO, International Engineering Company, INC. 220 Montgomery St-San Francisco-California”—cover page.
Includes bibliographical references.
Contents: 1. Abbreviations and equivalents, introduction, conclusions and recommendations—2. General economic background—3. The project area – the present situation—4. The proposed project—5. Flood control development—6. Irrigation development—7. Project roads and access—8. Proposed agricultural development—9. Project implementation—10. Economic evaluation –Exhibits—References.
Summary: “This report is prepared for the Asian Development Bank (ADB) in furtherance of an agreement between the government of Afghanistan and the ADB for assistance in preparing certain technical studies relating to the Helmand river, Afghanistan. The report presents the findings of a study to examine the feasibility of an integrated flood control and development scheme for the Chakhansur area in Afghanistan”—(p. 1).